Electrical & Mechanical Installation at Moreten Morrell College

Project Overview   This project involved a comprehensive Electrical & Mechanical installation at Moreten Morrell College, supporting the conversion of multiple existing spaces into modern, functional educational environments. The works included three converted barn buildings, a dedicated SEN (Special Educational Needs) teaching space, and the transformation of a previously redundant area into a new reception […]

View Full Case Study

De Montfort University Leicester – John Whitehead Lighting Replacement

Mealey Electrical Contractors were appointed to deliver a comprehensive lighting replacement at the De Montfort University in Leicester which consisted of five floors in the John Whitehead building. The objective was to modernise ageing lighting infrastructure, improve lighting quality and consistency across teaching and circulation areas, and reduce energy consumption and maintenance demands by transitioning […]

View Full Case Study

The Gateway 14 Ltd at Stowmarket

The Gateway 14 Ltd at Stowmarket, is a wholly owned subsidiary of Mid Suffolk District Council, and Jaynic its development manager. Bauder specialises in quality flat roof waterproofing systems, insulation, green roofs and rooftop solar PV to make buildings watertight, thermally efficient and positively support the environment. Introduction Plot 1600 Stowmarket Mealey Electrical Contractors have […]

View Full Case Study

Home Bargains Cardigan

Duration  6 weeks. Project Value  £220,000. This Building is an outlet unit that has been built for Home Bargains on the outskirts of Cardigan. Mealey Electrical Contractors have been asked to carry out the following works for the Cat A install of project. Electrical Design Main Distribution system Lighting install to car park & building […]

View Full Case Study

In Health Chelmsley Wood Shopping Centre

Duration – July 2024 – February 2025. Project Value £ 900,000.00. Chelmsley Wood Shopping Centre was constructed in the late 1970’s and comprises a number of predominantly single storey retail blocks. The shopping centre benefited from a £40 million extension and refurbishment programme in 2009 which saw it anchored by an ASDA superstore. In 2019, […]

View Full Case Study

DOX2 Amazon Banbury

History The existing Building was constructed in the 1970’s and was occupied by Jacob Douwe Egberts (JDE) – coffee manufacturers as part of a wider site development. The building has since been separated from JDE and is a standalone site. The building was refurbished in 2019 into an industrial unit. Containment system: Installation of 100mm² […]

View Full Case Study

DMU Heritage House

History Originally founded as the Leicester School of Art in 1870, the university has evolved through many incarnations including the Leicester Colleges of Art and Technology and Leicester Polytechnic. Leicester Polytechnic officially became De Montfort University on 26 June 1992. The building is over 120 years old and has seen many changes in its time. It […]

View Full Case Study

Solihull Offices

Mealey Electrical contractors were instructed to carry out the refurbishment of a first-floor open plan office area where individual meeting rooms were created, along with reception and kitchen areas. Mealey Electrical were employed in a sub-contractor capacity. The works consisted of modifications to the existing lighting as per the new office plans. The existing movement […]

View Full Case Study

Glenfield Hospital Leicester – Ward 34

Mealey Electrical Ltd. were commissioned to carry out the refurbishment of Ward 34 at Glenfield Hospital. Mealey Electrical were employed in a sub-contractor capacity. The mandate for the job consisted of removing the existing bedhead trunking in 6 bays and installing new bedhead trunking in 7 bay locations. The existing small power circuits were isolated […]

View Full Case Study

DMU Hawthorn building

Mealey Electrical Contractors Ltd were instructed to carry out lighting refurbishment works on all floor levels of The Hawthorn building at De Montfort University. The works involved working closely with the DMU staff to access the offices, classrooms and lecture areas to remove the existing Luminaires and replace them with Dextra Led Luminaires. The works […]

View Full Case Study

Brancote Raw Sludge Dewatering Project

Project overview Located to the east of Stafford, Severn Trent’s Brancote Sewage Treatment Works (STW) catchment will see an increase in population from 78,075 current population equivalent (PE) to 85,532 by 2028. The site is split into two distinct areas with the STW processing the sewage flows from within its own catchment and the sludge […]

View Full Case Study

De Montfort University – Gateway Entrance

Mealey Electrical Contractors Ltd. were asked by De Montfort University (DMU) to undertake the project of installing new outdoor lighting. Mealey followed a DMU specification for the works. We were asked to quote the installation of new power and lighting at the gateway entrance, we later won the contract and completed the following works: Design […]

View Full Case Study

DMU – Flight Simulator and Wind Tunnel Installation

Mealey Electrical Contractors Ltd were asked to quote the installation of an AIRFOX DISO flight simulator and a low-speed wind tunnel at De Montfort University. We later won the contract and began to complete the works. With the introduction of new courses at De Montfort, Mealey Electrical Contractors Ltd developed and installed a De Montfort […]

View Full Case Study

Heron Foods Newport

Maes Glas: New Store Fit Out Mealey Electrical Contractors Ltd. were commissioned by Heron Foods to fit out their new store in Maes Glas, Newport. As the principal contractor for the refit of the store we completed the following works to a supplied specification from Heron Foods: Installation of electrical systems (freezers, fridges, tills, sockets, […]

View Full Case Study

Leicester General Hospital Kitchen & Chiller Upgrade

Mealey Electrical Contractors Ltd. were commissioned by Leicester General Hospital to upgrade their kitchen and chiller system. The works consisted of: Upgrade of existing power and control system to the kitchen, food storage and food prep areas Removal of the existing Woodley system Installation of new cable tray system for the installation of power and […]

View Full Case Study

Heron Foods, Willenhall Store, New Store Fit Out

Mealey Electrical Contractors Ltd. were asked by Heron foods to undertake the project for the fit out of the new Store in Willenhall, Coventry. As the principal contractor for the fit out of the store we completed the following works to a supplied specification from Heron Foods: A full rip out of the existing building […]

View Full Case Study

DMU John Whitehead Refurbishment Works

Mealey Electrical Contractors Ltd. were instructed to carry out small power, lighting and fire alarm refurbishment works on 3 levels of the John Whitehead building at De Montfort University (DMU). The John Whitehead building is one of the main administrative buildings within the university and is a key point for processing of data. The following […]

View Full Case Study

Leicester City Football Club

Mealey Electrical Contractors Ltd. were initially contacted by Leicester City football club who were enquiring about the possibility of refurbishing the executive and entertainment area within the stadium. The works carried out included: Creating and designing our own self-made proposal for lighting Alterations to the existing power supply to ensure compatibility with new lighting system […]

View Full Case Study

Wenlock Way Warehouse and Offices, Leicester

Mealey Electrical Contractors Ltd. were contacted by the landlord and client to put together an electrical proposal for their warehouse and office space. We put together a design for the lighting, the power requirement and the fire alarm. Once the client was satisfied with the designs, we costed the project based on the design that […]

View Full Case Study