Mealey Electrical Contractors Ltd. were commissioned by Leicester General Hospital to upgrade their kitchen and chiller system.

The works consisted of:

  • Upgrade of existing power and control system to the kitchen, food storage and food prep areas
  • Removal of the existing Woodley system
  • Installation of new cable tray system for the installation of power and control wiring to 22no new room coolers
  • Installation of power supplies to condense pumps supplied from BMS Control panel
  • Power and control wiring to the plant room area
  • Installation of power and controls to three chiller units located adjacent to the plant room
  • Power to new BMS control panel, alteration to the existing control to existing air handling units
  • Alteration to existing power and lighting
  • Installation of tray work for the installation of the Rehau pipe work system to supply the new room cooler