Woodlands School - Luton

Carried out electrical Installation works to the following elements in the school:

  • Fire damper system
  • Natural ventilation fire damper system
  • Wind catcher and natural ventilation system
  • Underfloor heat controls
  • Building management system
  • Ventilation system
  • Heat recovery system

Leicestershire Police Authority - Hamilton Police Station

Working in partnership with AES Control Systems Northampton Mealey Electrical Contractors Limited undertook the installation of new inverter on the existing air handling plant and alteration of the existing control wiring supplied from the existing BMS control panel.

Harley Street - London

Mealey Electrical Contractors Limited was commissioned by The London Clinic to prepare a detailed report, following the surveying, inspection and testing of the existing electrical systems.

The following report has been compiled to cover the following London Clinic buildings as indicated below

  • 145 Harley Street;
  • 147-149 Harley Street;
  • 18 Devonshire Place;
  • 20 Devonshire Place.

The findings from the survey, inspection and testing were submitted for approval.

Mealey Electrical were commissioned to undertake the recommended upgrades.

Ferry Sports Hall

Job description:
Lighting, design, pay-back check and calculations on carbon footprint.

Job details:
After collecting the relevant data, we put together a lighting scheme and also looked at controls and daylight sensor, given that there was quite a lot of natural light on site.

PV Solar Panels

We attended the site to carry out a survey and explain to the customer the benefit of Photo voltaic, and explain how the system works. We also provided information on the rail system and roof mounting kit.

After the full survey we completed the design back at the office, and put together the costing and also the payback based on the sap calculation.

Our Managing director attended site and went through the information that we had sent to our customer. Our customer placed the order, and we instructed our scaffold contractor to erect the scaffolding.

We installed the system, commissioned and registered it, and also registered as part of the part P scheme. Instructed the customer on the use of the system, and answered any question that they might have regarding the system.